Built in 2025 for Richard Schulz Tiefbau GmbH, the bridge over the Spree at Bräsinchen is a welded and painted aluminium structure of 36.8 m by 2.5 m.

Built in 2025 for Richard Schulz Tiefbau GmbH, the bridge over the Spree at Bräsinchen is a welded and painted aluminium structure of 36.8 m by 2.5 m.
We also supply aluminium railings and parapets on their own — fitted to concrete and steel structures already in service, without hot work on site.