Built in 2024 for the municipality of Efringen-Kirchen, this 5.5 m by 1.5 m bridge is assembled entirely with bolted connections and finished in anodised aluminium rather than paint.

Built in 2024 for the municipality of Efringen-Kirchen, this 5.5 m by 1.5 m bridge is assembled entirely with bolted connections and finished in anodised aluminium rather than paint.
We also supply aluminium railings and parapets on their own — fitted to concrete and steel structures already in service, without hot work on site.