Built in 2025 for Antritt-Bau GmbH + Co. KG, this 35.85 m aluminium footbridge carries a path over the railway at Fürth, Bavaria. The welded and painted structure is 2.5 m wide.
Weight is the whole argument over a railway: a possession is counted in hours, and aluminium weighs roughly a third of what steel weighs for the same volume, so a span like this is set in a single crane lift rather than assembled above a live line. The bridge is CE marked under EN 1090-3, certificate 2268-CPR-434.


