Choosing an aluminium bridge manufacturer: the shortlist test

Aerial view of the 116.6 m aluminium foot and cycle bridge over the Leinbach in Schwaigern

To choose an aluminium bridge manufacturer, compare three things before price: whether the firm fabricates the bridges itself under an EN 1090-3 certificate, whether it has delivered structures close to yours in length and load, and who signs the design. A shortlist built on those three answers stays short, and it saves a round of clarifications after the tender closes.

This guide belongs to the stage before the tender, when a municipality or contractor is deciding whom to invite. The paperwork collected later, from the Declaration of Performance to the maintenance manual, can only confirm a choice made here.

Manufacturer, extruder or reseller: who really builds an aluminium bridge

Three kinds of company appear when you search for an aluminium bridge manufacturer. An extruder produces profiles and may fabricate to a customer’s drawings, while the design and the site usually stay with someone else. A reseller or general contractor buys a structure and manages the job. A bridge manufacturer designs and fabricates the structure and can show you the factory where that happens.

Each of them can be right for a given project, but a public client needs to know which one it is dealing with, because responsibility for CE marking rests with the company placing the component on the market. Ask who issues the Declaration of Performance, and if the answer is a subcontractor, assess that subcontractor as the manufacturer.

Six checks that sort an aluminium bridge manufacturer shortlist

TarkistaAsk forWeak answer
Certificate scopeEN 1090-3 and classSteel or ISO 9001 only
Comparable bridgesLength, width, loadPhotos without figures
DesignEurocode 9 calculationsSupplier’s own standard
WeldingPlace and coordinatorNobody named
TransportLongest unit, weightDecided after award
AftercareWritten inspection regimeVerbal promise

The first check takes minutes, because the scope line of an EN 1090 certificate names both the material and the execution class. A company certified for steel only has told you nothing about its right to CE mark an aluminium crossing, however good its steelwork may be.

How to read an aluminium bridge manufacturer’s project references

A reference is useful when it states length, width, imposed load, client and year, because those five facts show whether the job resembles yours. A 12 m park crossing proves very little about a span over a railway, even when both photograph well.

Our own project list shows why the figures matter. The Bachstraße bridge in Schwaigern is 116.6 m long and 4.0 m wide and is designed for 5 kN/m² and 5 t service vehicles, while the Am Stausee bridge in Sohland is 27.03 m long, 2.5 m wide and weighs 5 tonnes. Those are different engineering problems, so ask each candidate for two references close to your own project and a contact at each client.

Why weight and transport belong in the choice of bridge manufacturer

The distance to the factory matters less than what can travel by road. A structure arrives in one piece or in sections, and that decision sets the transport permit, the crane and the number of joints made on site. At Sohland the 27 m span travelled as one piece, which made road transport a harder task than the lift itself.

Ask every candidate for the weight of the structure and the size of its longest transport unit before the design is fixed. On the six delivered bridges in our weight table the structure came to between 74 and 145 kg per square metre of deck, and a figure far outside the range for a comparable load deserves a question.

Who designs the aluminium bridge and who signs the calculations

The designer should be named before bids are invited, because Eurocode 9 and the national annex of the country of installation decide what the structure must be. Aluminium is about a third as stiff as steel, so deflection and vibration often govern the design, and an offer that only states strength has left out the part you will feel underfoot.

Ask whether the calculations are delivered in a form your own checking engineer can follow, and who holds professional responsibility for them. A statement that the structure complies is a different thing from a report that can be checked.

Welded or bolted: what the answer says about a bridge manufacturer

Both methods are legitimate, and the useful question is where the welds are made and who controls them. The bridge at Sohland is fully welded and coated, while the N5 footbridge at Eggenstein-Leopoldshafen is assembled with bolted connections throughout and can be taken apart and moved. For a public crossing at execution class EXC3, ask for the named welding coordinator and whether any structural weld will be made on site.

What to ask an aluminium bridge manufacturer about aftercare

A warranty on the metal and a warranty on the coating are separate promises, so ask for each period in writing along with what is excluded. Ask too for the inspection regime the manufacturer expects you to follow, because a warranty conditional on inspections nobody budgeted for has little value. These answers also make it easier to compare bridge quotations on the same basis.

Invite three aluminium bridge manufacturers, not eight

Three candidates who pass these checks will produce offers you can actually compare, while eight usually produce eight different structures. DR VERSLAS designs and fabricates aluminium bridges in Vilnius, and the certificates behind that work are published so that you can run the first check before contacting us. Send us the length, width and load of your crossing and our engineers will tell you whether it fits what we build.