Linteler Kirchweg Railway Footbridge, Hude

Aluminium footbridge carrying the Linteler Kirchweg over the Deutsche Bahn line at Hude
Hude, Niedersachsen
Tyskland
Deutsche Bahn line HU 10
Pedestrian and cycle bridge
22.45 m
3.0 m
5 kN/m²
8.5 t
EN 1090-3, cert. 2268-CPR-434
Carry the Linteler Kirchweg over the Deutsche Bahn line HU 10 at Hude.
An aluminium truss 22.45 m long and 3.0 m wide, weighing 8.5 t, designed for 5 kN/m².
The second railway crossing built by Dr Verslas, set in a single crane lift.
53.10936
8.46135

The Linteler Kirchweg bridge carries a foot and cycle path over the Deutsche Bahn line at Hude in Lower Saxony. It is the second railway crossing Dr Verslas has built.

The structure is 22.45 m long and 3.0 m wide, weighs 8.5 tonnes and is designed for an imposed load of 5 kN/m² — the crowd loading that applies to public footbridges across Europe.

Weight is the whole argument over a railway. A track possession is counted in hours, and aluminium weighs roughly a third of what steel weighs for the same volume, so a span like this goes in under one mobile crane in a single lift rather than being assembled above a live line. There is no repainting cycle to plan over the tracks either, which is where the difference shows up in life-cycle cost rather than in the tender price.

The bridge is CE marked under EN 1090-3, certificate 2268-CPR-434.

We also supply aluminium railings and parapets on their own — fitted to concrete and steel structures already in service, without hot work on site.