The Carl-Metz-Straße bridge carries a foot and cycle path over the Leinbach at Nußloch, Baden-Württemberg, built for the municipality of Nußloch.
The aluminium structure is 8.6 m long and 4.0 m wide, weighs 5 tonnes and is designed for an imposed load of 5 kN/m² together with service vehicles up to 7.5 tonnes. It left the works in April 2026 as serial number 09.


