At the beginning of June 2026 we installed our second bridge in Leipzig, a fully welded and painted aluminium structure 18.83 m long and 3 m wide.
Two spans of almost the same geometry, a few weeks apart, on the same river: this is where prefabrication pays. The second structure went through the works as a repeat of the first, and the site sequence was the same — one crane, one lift, anchor bolts.
The bridge is CE marked under EN 1090-3, certificate 2268-CPR-434.

