Provide a footbridge for the N5 development area in Eggenstein-Leopoldshafen.
An aluminium truss 16.3 m long and 2.8 m wide, assembled entirely with bolted connections and powder coated.
A span with no welds at all, designed for 5 kN/m².
49.08833
8.40031

The footbridge for the N5 development area in Eggenstein-Leopoldshafen is 16.3 m long and 2.8 m wide, designed for an imposed load of 5 kN/m².

It carries no welds at all. The entire structure is assembled with bolted connections and the profiles are powder coated, which matters for two reasons: there is no heat-affected zone to reduce the strength of the alloy at the joints, and the bridge can be dismantled and relocated rather than cut up. Where a welded span has to be declared under an execution class that covers welding, a bolted one shifts the control effort to the fasteners.

Powder coating here is a finish rather than corrosion protection — aluminium does not rust. What the detailing has to avoid is direct contact with dissimilar metals at the bolted joints, which is a question of galvanic corrosion.

The bridge is CE marked under EN 1090-3, certificate 2268-CPR-434.

We also supply aluminium railings and parapets on their own — fitted to concrete and steel structures already in service, without hot work on site.